PressForm3D die casting tooling design

Projects / Lighting

80 W luminaire housing with thermal control

The casting was designed from scratch. The mould carries a thermal control system.

An 80 W LED luminaire.

What was done

  • The casting was designed from scratch.
  • The mould was built with a thermal control system.

Timing: design and approval of the casting — 10 days; mould design — 3 weeks.

Thermal control is no luxury here: a stable mould temperature keeps the housing within tolerance and noticeably extends tool life.

Send the part — get a price and a schedule

Request a quote

Attach a 3D model or a drawing of the part and tell me which machine it runs on. Within 24 hours you get a fixed price, a delivery date and a draft contract.

  • What I need
  • 3D model or drawing of the part
  • Die casting machine type
  • Alloy and annual volume